Working in High Winds — Non-Crane
Construction · Ver en español
Talking points
- Wind affects every elevated task — scaffold work, roofing, curtain wall installation, material handling at height — even when wind speeds are below crane shutdown thresholds.
- Sheet materials — plywood, drywall, metal panels, insulation boards — act as sails. A 4x8 sheet of plywood in a 30 mph gust can exert hundreds of pounds of force on the person holding it.
- Secure all loose materials, tarps, and debris at the end of every shift. What is sitting safely on a platform in calm air becomes a projectile in a gust.
- Scaffolding with solid enclosures (shrink wrap, containment tarps) catches wind like a wall. Monitor wind speed and consider partially opening enclosures to reduce wind loading in storms.
- Establish site-specific wind speed action levels — typically 25 mph for elevated work, lower for material handling. Use an anemometer, not your judgment, to measure wind speed.
Ask the crew
What is the wind doing today — and do we have materials at height that could become projectiles?
Standards this talk is built on
- Section 5(a)(1)
A toolbox talk is a short safety briefing. It supports the training a standard requires; it does not replace it.
Run this talk with your crew and keep the record
In Jobsite, workers sign in on their phones in English or Spanish, and you keep who attended, when, and where, with every other talk your crew has had.
Using an AI assistant? Jobsite's free MCP server serves this library, with OSHA rule text, no sign-in: https://jobsitecerts.com/api/mcp/public (/mcp)
Sign-in sheet
Print this page to collect signatures, or run the talk in Jobsite and workers sign in on their phones.
| Name | Signature | Date |
|---|---|---|
© Jobsite. Free to read aloud, print and use in your own crew's safety meetings. Republishing, reselling or bulk-copying these talks is not permitted.