Free toolbox talk · Struck-By · 10 min

Demolition Debris Management

Construction · Ver en español

Talking points

  1. Debris chutes are required when dropping demolition material more than 20 feet. Chutes must be enclosed for the entire length and the discharge end must be barricaded.
  2. Never throw material over the side of a building. Debris bounces, shatters, and can strike workers, pedestrians, or vehicles far from the intended drop zone.
  3. Enclosed containers (dumpsters positioned at the building) allow controlled interior demolition waste disposal. Protect the container opening with a gate or cover when not actively in use.
  4. Separate demolition waste: hazardous materials (asbestos, lead paint, PCBs) must be segregated, bagged, and disposed of per EPA and state regulations — not mixed with general debris.
  5. Pedestrian and public protection: on urban demolition sites, barricade the sidewalk and install overhead protection (covered walkways, fans) to protect passersby from falling debris.

Ask the crew

How are we managing demolition debris today — chutes, containers, or controlled drops — and is the area below protected?

Standards this talk is built on

A toolbox talk is a short safety briefing. It supports the training a standard requires; it does not replace it.

Run this talk with your crew and keep the record

In Jobsite, workers sign in on their phones in English or Spanish, and you keep who attended, when, and where, with every other talk your crew has had.

Using an AI assistant? Jobsite's free MCP server serves this library, with OSHA rule text, no sign-in: https://jobsitecerts.com/api/mcp/public (/mcp)

Sign-in sheet

Print this page to collect signatures, or run the talk in Jobsite and workers sign in on their phones.

NameSignatureDate

© Jobsite. Free to read aloud, print and use in your own crew's safety meetings. Republishing, reselling or bulk-copying these talks is not permitted.