Free toolbox talk · Struck-By · 10 min

Concrete and Masonry — Post-Tensioning

Construction · Ver en español

Talking points

  1. Post-tensioning involves stressing steel strands or tendons to extremely high forces. A strand that breaks or releases can travel hundreds of feet at lethal velocity.
  2. No workers may stand behind stressing jacks during tensioning operations. The area behind the jack must be barricaded and cleared.
  3. Follow the engineer's stressing sequence exactly. Out-of-sequence tensioning can cause uneven forces that lead to structural failure or strand blowout.
  4. Inspect anchorage hardware before tensioning — damaged wedges, cracked bearing plates, or misaligned strands can cause failures under load.
  5. After tensioning is complete and strands are cut, the remaining tail must be protected to prevent contact injuries from sharp wire ends.

Ask the crew

Is the barricade set up behind all stressing jacks, and does everyone know to stay out of the strand path?

Standards this talk is built on

A toolbox talk is a short safety briefing. It supports the training a standard requires; it does not replace it.

Run this talk with your crew and keep the record

In Jobsite, workers sign in on their phones in English or Spanish, and you keep who attended, when, and where, with every other talk your crew has had.

Using an AI assistant? Jobsite's free MCP server serves this library, with OSHA rule text, no sign-in: https://jobsitecerts.com/api/mcp/public (/mcp)

Sign-in sheet

Print this page to collect signatures, or run the talk in Jobsite and workers sign in on their phones.

NameSignatureDate

© Jobsite. Free to read aloud, print and use in your own crew's safety meetings. Republishing, reselling or bulk-copying these talks is not permitted.